How to switch research platforms in 90 days

A five-step, 90-day sequence for switching user research platforms without getting caught by an auto-renewal. Audit the contract for the notice window, escalator and export clause, export transcripts, tags, insights and participant records while you are still a customer, run a real study on the new tool in parallel, give notice inside the window, then migrate only what is still cited. Koji's built-in panel lets the parallel pilot run without a separate recruitment contract.
Where this appears
What's in this process
- Days 90 to 75: audit the contract: Find the renewal date, notice window, auto-escalator, export clause and wind-down rights.
- Days 75 to 60: export everything: Transcripts and recordings first, then tags, insights and participant records, into storage you control.
- Days 60 to 45: run a parallel study: A live study with real participants and a real decision attached, not a demo.
- Days 45 to 30: give notice, then negotiate: Inside the window. Leave cleanly, or weigh a retention offer against a tool you have used.
- Days 30 to 0: migrate selectively: Move what is still cited, archive the rest as flat files, then cut over.
Use this image
Free to use in your docs, decks and posts under CC BY 4.0, as long as you credit Koji with a link to this page. To embed it, paste this into your page:
html
<a href="https://www.koji.so/visuals/switch-user-research-platform-90-day-sequence"><img src="https://www.koji.so/visuals/switch-user-research-platform-90-day-sequence/switch-user-research-platform-90-day-sequence.png" alt="Process of a 90-day research platform switch: audit the contract, export everything, run a parallel study, give notice, then migrate selectively." width="1200" height="739" /></a>
<p>Source: <a href="https://www.koji.so/visuals/switch-user-research-platform-90-day-sequence">How to switch research platforms in 90 days</a>, Koji</p>