All frameworks and cheat sheets

Guide

Five survey costs your CPI quote leaves out

List of five survey costs not covered by cost per interview: questionnaire design, programming, data cleaning, analysis and follow-up qualitative.
The respondent is often the smaller part of the bill.

Five costs of a survey project that sit outside the cost per interview: questionnaire design, programming, data cleaning, analysis and the follow-up qualitative work needed to explain the numbers. Use it to build a full budget before you compare quotes. Koji combines the percentage and the reason in one study and analyzes the answers automatically.

Where this appears

What's in this guide

  1. Questionnaire design: Plus the rework when a soft launch exposes a broken screener.
  2. Programming and testing: Building the survey and checking every path before launch.
  3. Data cleaning: Removing speeders, straightliners and fraud, then buying replacements.
  4. Analysis and reporting: Usually the biggest hidden cost, since a data table is not an insight.
  5. Follow-up qualitative: A survey tells you 40% are unhappy. Finding out why takes a second study.

Use this image

Free to use in your docs, decks and posts under CC BY 4.0, as long as you credit Koji with a link to this page. To embed it, paste this into your page:

html
<a href="https://www.koji.so/visuals/survey-costs-cpi-leaves-out"><img src="https://www.koji.so/visuals/survey-costs-cpi-leaves-out/survey-costs-cpi-leaves-out.png" alt="List of five survey costs not covered by cost per interview: questionnaire design, programming, data cleaning, analysis and follow-up qualitative." width="1200" height="737" /></a>
<p>Source: <a href="https://www.koji.so/visuals/survey-costs-cpi-leaves-out">Five survey costs your CPI quote leaves out</a>, Koji</p>