Process
How to run an assumption mapping session

A five-step agenda for an assumption mapping workshop, with timings for each step, from the first brain dump to assigning a test and owner to each priority assumption. Product teams can run it before each new initiative or feature, ahead of sprint planning. The output is a short list of risky assumptions, each with a planned test such as customer interviews, a survey or a prototype.
Where this appears
What's in this process
- Brain dump all assumptions: 10 minutes. One per sticky note, no editing. Aim for volume.
- Cluster and deduplicate: 10 minutes. Group similar ones and aim for 15 to 30 distinct assumptions.
- Map them on the matrix: 20 minutes. Agree on importance and uncertainty. Disagreement is a signal.
- Pick the top 3 to 5: 10 minutes. Take the ones that are important and unproven.
- Assign a test and an owner: 10 minutes. How each gets tested, who owns it and by when.
Use this image
Free to use in your docs, decks and posts under CC BY 4.0, as long as you credit Koji with a link to this page. To embed it, paste this into your page:
html
<a href="https://www.koji.so/visuals/assumption-mapping-session-five-steps"><img src="https://www.koji.so/visuals/assumption-mapping-session-five-steps/assumption-mapping-session-five-steps.png" alt="Process for a 60 to 90 minute assumption mapping session in five steps: brain dump, cluster, map on the matrix, pick the top 3 to 5, assign tests." width="1200" height="739" /></a>
<p>Source: <a href="https://www.koji.so/visuals/assumption-mapping-session-five-steps">How to run an assumption mapping session</a>, Koji</p>




