Assumption map: importance vs uncertainty

An assumption map, the 2x2 product teams use to decide which assumptions to test first. It plots each assumption by how important it is to the idea and how uncertain the team is about it. Assumptions that are both critical and unproven get tested first. Run it as a 60 to 90 minute team workshop, then test the top 3 to 5 with customer interviews, which Koji can run as AI-moderated studies.
Where this appears
What's in this matrix
Vertical axis: Uncertainty (Low to High). Horizontal axis: Importance (Low to High).
- Test if resources allow (High uncertainty, Low importance): Unproven, but the idea survives if it turns out wrong.
- Test these first (High uncertainty, High importance): The idea fails if they are wrong, and you have no evidence yet.
- Accept as given (Low uncertainty, Low importance): You are fairly sure, and little rides on it.
- Monitor, light validation (Low uncertainty, High importance): Critical, but you already have evidence. Keep an eye on it.
Use this image
Free to use in your docs, decks and posts under CC BY 4.0, as long as you credit Koji with a link to this page. To embed it, paste this into your page:
html
<a href="https://www.koji.so/visuals/assumption-map-importance-uncertainty-matrix"><img src="https://www.koji.so/visuals/assumption-map-importance-uncertainty-matrix/assumption-map-importance-uncertainty-matrix.png" alt="Matrix mapping product assumptions by importance and uncertainty: test high-importance, high-uncertainty ones first and accept low ones as given." width="1200" height="630" /></a>