All frameworks and cheat sheets

Reference table

Category entry points vs jobs to be done vs trigger events

Three frameworks that get confused, compared on six dimensions

Table comparing category entry points, jobs to be done and trigger events by core object, time horizon, use, measure, unit and sample needed
They are complements: JTBD explains why, trigger events explain when a deal starts, and CEPs show which situations you own.

A side-by-side comparison of three demand frameworks that are often mixed up. Category entry points are recurring situations that cue a category and are measured as a brand's share of those situations across many buyers. Jobs to be done describe the progress a customer wants and need small, deep samples. Trigger events are single moments that start a deal and are tracked as signals. Use it to pick the right study, then run the interviews in Koji.

Where this appears

What's in this reference table

Category entry pointsJobs to be doneTrigger events
Core objectA situation that cues the categoryA goal the customer hires a product to achieveA discrete event that starts a buying process
Time horizonRecurring, often habitualStable across occasionsA single moment in a specific deal
Primary useMental availability and media planningProduct design, positioning, segmentationSales timing and demand capture
Measured asShare of situations the brand is linked to, across a populationProgress, struggle and switching forcesPresence or absence of a signal
Typical unitThe occasionThe customerThe account or deal
Sample neededLarge, quantifiedSmall, deepOperational, ongoing

Use this image

Free to use in your docs, decks and posts under CC BY 4.0, as long as you credit Koji with a link to this page. To embed it, paste this into your page:

html
<a href="https://www.koji.so/visuals/category-entry-points-vs-jobs-to-be-done-vs-trigger-events"><img src="https://www.koji.so/visuals/category-entry-points-vs-jobs-to-be-done-vs-trigger-events/category-entry-points-vs-jobs-to-be-done-vs-trigger-events.png" alt="Table comparing category entry points, jobs to be done and trigger events by core object, time horizon, use, measure, unit and sample needed" width="1200" height="852" /></a>
<p>Source: <a href="https://www.koji.so/visuals/category-entry-points-vs-jobs-to-be-done-vs-trigger-events">Category entry points vs jobs to be done vs trigger events</a>, Koji</p>